Game setup for evaluation. Top of pf stripped for clean and polish. Gathering parts for powder coat and starting to order additional parts for refurb. Top of pf cleaned, polished and waxed. Top of pf going back together. Working on sourcing some plastics. Armor and ramps dropped off for powdercoat. Top of pf going back together. New plexi intalled in backbox. Shooter housing had to be replaced due to the old rod cannot be removed. Screw hole above the saucer will have to be filled in before installing the new cliffy. Waiting on parts to continue. New shooter installed. New plastics set has arrived and will be installed. Cliffy installed. Main ramp back in. Waiting on powdercoat to finish up.
