Home / In Work / Six Million Dollar Man restore/refurb - update 8-5-22 17

Game setup to get cabinet measurements. Cabinet is built and in paint. Top of pf stripped, cleaned, polished and waxed. LEDs installed, all mechs rebuilt, targets replaced. Ordering new plastic posts and cpu needs to be replaced due to acid damage. One sling kicker needs to be fixed. New plastics ordered. First level of assembly complete - ready for initial testing once the new mpu arrives. Cabinet has it's second color applied. Final clearcoat will be next. MPU installed and currently testing. Pf back together. Cleaning up a few things and moving to final testing. Cabinet back ready to finish up and transfer everything. Cabinet set up - leg plates and cabinet protectors installed, slide rails being installed. Ground braid goes in next and then transfer of harness and hardware. Siderails and coin door getting aligned for install. Cab almost done.