Home / In Work / High Speed - pf swap - DONE 16

Pf swap and refurb. Pf pulled out of the game and stripped top and bottom. New pf most lamp sockets on more on order. Topside getting initially populated. One trough guide was welded and will be replaced. A long ball guide has a section cut off and will be replaced. Topside almost done with primary level. Harness and mechs almost done- Need to rebuild flippers and pops and fix some hacks. Pf is back in the game. In initial testing. all lamps and switches good, working on coils/flashers. Plastics being rebuild and initially placed. First level pretty much done. Star rollovers installed, Pf assembly done. Had to order another stop light assembly old one was toast. In final testing and adjustment for optimal gameplay.