Vector - refurb for customer - update 4-5-20

Refurb for customer - Top of pf stripped for clean polish and wax. Flippers rebuilt, pop mech rebuilt. Leds done, Top of pf cleaned, polished and waxed. Drops rebuilt and re-installed. Cpu boots maybe 1 out of 10 tries has corrosion. Initial testing continues. New mpu allows full testing. Top of pf almost done. New trough switch blade made. Flipper mechs are binding for some reason. Figured out the drop target issue.- someone installed and incorrect coil (green) new coil on order. Figured out both of two lamp problems - broken wire on one - connector issue with the other. New coil installed, position trough switches and flipper binding next.

Album info

Popular tags