Space Invaders - pf swap for customer - update 2-22-21

Swap pf with new repro. Pf pulled. Top stripped and bottom ready for harness/ mech removal. PF stripped. Mechs cleaned and parts on order to rebuild. T-nuts installed and lamps being laid out on the back of the pf. Top of pf being laid out. Lamps and braid ready for soldering.

Album info

Popular tags